TestBeforeInvest · Digital Hub for Utility Services
A cloud platform for simulating and auditing electrical grids — from the substation to the regulator. Part of UDIH 4 EU.
A typical grid-connection engineering study today requires months of coordination between consultants, the regulator and the grid operator. Every revision restarts the process.
6–8
weeks for a typical interconnection study
€50K+
average external-consultant engagement
v12+
diagram revisions per project
TestBeforeInvest brings design, simulation and reporting into one collaborative environment — available to the entire team from day one.
Multiple engineers work on the same diagram at the same time, with every edit traceable to its author.
Every calculation, every edit and every PDF export is preserved — and revertable with one click.
Export PDF reports aligned with KEVR and ESO requirements — no manual formatting needed.
UI and documentation authored in Bulgarian — not translated, but designed for Bulgarian engineers.
Eight tools for designing, analysing and reporting on electrical grids — all in one platform.
Design lines, substations and transformers in a visual editor.
Compute bus voltages and line loadings across scenarios.
Simulate failure of any element and assess grid resilience.
Seasonal and daily consumption profiles for capacity planning.
Generate submission-ready documents aligned with KEVR and ESO requirements.
Granular rights for viewing, editing and approving projects.
Full traceability — who changed what and when, with one-click revert.
Organisations and sub-units with isolated data and shared templates.
From building your grid to a regulator-ready report — a real-world TestBeforeInvest scenario.
Lay out your grid directly in the editor — place lines, substations and loads on the map and TestBeforeInvest validates the topology as you go.
Drop the new asset on the map, set installed capacity, generation profile and point of interconnection.
Run power-flow and N-1 analysis. Generate a PDF report ready for submission to KEVR or the grid operator.
TestBeforeInvest doesn't replace your engineering team — it frees them from repetitive work.
Every calculation, every decision and every user — fully traceable.
Submission-ready documents aligned with KEVR and ESO requirements.
Every diagram and parameter change captures author, timestamp and reason.
Granular rights for viewing, editing and approving — scoped by team and project.
An EU co-funded initiative for digital transformation of utility services. EU-hosted, GDPR-compliant data handling.
No seat licences, no annual subscriptions. Token-based pricing — for actual simulation time used.
Unlimited users. Tokens for simulations. Volume discounts. PDF reports and audit log included.
Contact us for pricingTestBeforeInvest is the electrical-sector vertical of a broader partner network united under the initiative for digital transformation of utility services.
TestBeforeInvest is part of the UDIH 4 EU initiative (BG16RFPR002-1.002-0008) — the Hub for Digital Transformation of Utility Services, co-financed by the European Union through the European Regional Development Fund. Our role within the initiative is the cloud simulation platform for the electrical sector.
Yes. PDF reports are structured per KEVR requirements for grid-connection studies. Format and content update whenever regulation changes.
You do. TestBeforeInvest is a processor, not an owner. Your data is stored in the EU; you can export or delete it at any time.
Pricing is token-based. Enterprise customers get a custom quote — contact us for details.
Yes. The application ships Bulgarian from day one. An English UI is on the way.
Have a question about TestBeforeInvest or want a quote? Here's how to reach us.